Probello crew reviewing a facility checklist

Service

Post-Construction Cleanup

Phase-based construction cleaning that moves at the pace of your schedule and holds up to a punch walk.

What the scope covers

  • Rough clean: debris removal and gross dust knockdown
  • Final clean: glass, fixtures, millwork, and floors
  • Touch-up clean before occupancy or handover
  • Adhesive, paint, and grout haze removal
  • Protective film and sticker removal
  • Floor sealing and initial finish where specified

What you get

  • Crews sized to hit turnover dates
  • Punch-list detail on the first pass
  • Coordination directly with your GC or PM

Standard on every account

  • Built for commercial standards — Professional cleaning for demanding environments.
  • Presentation is everything — Because your space represents your brand.
  • A named account manager — one number, one point of accountability, responses in hours.

Before & after

From dust-covered site to move-in ready

Drag the slider to compare.

The same commercial office spotless and move-in ready after Probello's final construction clean
Newly built commercial office covered in drywall dust and construction debris before cleaning
BeforeAfter
Representative post-construction final clean: dust removal from all surfaces and ceilings, debris haul-out, glass and frame detailing, and floor finishing before occupancy.

Get a scoped post-construction cleanup proposal

Free walkthrough. No pressure. A written scope and price back within one business day.